Grace Period For London DVS

IF YOU have a vehicle over 12 tonnes (GVW) and serve London, there are actions you must do NOW, stresses the RHA.
Transport for London (TfL) will begin enforcing the DVS standard from 1 March 2021, however, you may be eligible to join an ‘allow list’ which grants HGV operators who register with TfL before 1 March 2021 a ‘grace’ period of a ‘defined’ 90 days to comply with the DVS requirements.
Registration is conditional on operators providing evidence of their applications or planned installation arrangements for safe system equipment to their vehicles.

Share this story